Blueprint for Safety HomeRisk Control Manual Homewww.fcci-group.com
Protecting Business, Property, and People Commercial Auto Risk Control General Liability Risk Control Workers' Comp Risk Control Property Risk Control Inland Marine Risk Control Commercial Crime Risk Control Appendices Supplements
General Liability
Products and Completed Operations Liability
Premises and Operations Liability
Employment Practices Liability
Visitor Accident Investigation
Appendices C
1. Products Liability Risk Control
    Checklist
2. Completed Operations
    Checklist
3. Premises and Operations
    Liability Checklist
4. Visitor Accident Report
5. General Liability Additional
    Resource List
Bulletins
Visitor Accident Handling Guidelines
Planning for Emergency Evacuation
Escalators
Product Liability Risk Control
Product Recall Checklist
Construction Defect Law
 
©2007 FCCI Services, Inc.

Printer Friendly Version  

RISK CONTROL BULLETIN
Planning for Emergency Evacuation
If you are responsible for the safety of visitors or guests, whether you operate a huge outdoor arena or a storefront business:

•  How would you handle a bomb threat?
•  Where would you guide your patrons if immediate evacuation is needed, whether for bomb
   threat or other reason?
•  How do you deal with patrons with disabilities?
•  Who makes sure people in restrooms, locker rooms, etc., are notified and are vacated
   along with the others?
•  Who makes all these decisions and how do you communicate with that person and vice
   versa?
•  Who in the community can help you with the answers?

There are a lot of little things that must come together for an emergency evacuation to happen. The first is to recognize that the need is rare, and because of that, readiness must come from pre-planning rather than "winging it." If pre planning enabled an NFL Club to safely evacuate its stadium during a game (as one did in 1991) to protect fans from an oncoming electrical storm, it can work for you also.

The details within a plan can be extensive or relatively brief. Everyone has their own needs, circumstances, and preferences. However, there are six considerations needed in any plan:

1. The decision-making process
2. The information-awareness process
3. The egress-preparation process
4. The egress process
5. The return process
6. The evaluation process

Decision-Making

•  Who is the point-person needed to make the decision of whether and when the evacuation
   is "go"? Who is his/her backup?
•  Who are the others needed to share in the pre-decision process, coordinating the major
   steps within the evacuation process, communicating with the community's fire/police and
   press, etc.?
•  Are all the people with responsibility known and readily accessible?

Information-Awareness

•  What criteria are in place for choosing to act? For example, how long before a storm is
   expected to hit should the decision be made to evacuate a jobsite or cease outdoor
   operations?
•  How best can needed information be obtained in time for that decision? For outdoor
   operations, a functional link with the local weather station for receiving and evaluating
   storm warnings in the area works well for many.
•  While management can determine who is the communications link for weather problems,
   bomb threats can come to anyone. Is planning in place for managing that different source
   of threat, how about for fire or earthquake?

Egress Preparation

•  Is there egress preparation planning that determines in advance how the decision maker
   can best alert the appropriate personnel that a decision to evacuate is being considered?
•  Planning should provide readiness to ensure best routes of egress for the number of
   evacuees and the preferred area of refuge. It can also ensure keeping inbound lanes open
   for fire trucks and ambulances.

Egress Process

•  When emergency staff has been advised of the decision to evacuate, is there provision to
   announce directions to guide the evacuation? Pre-planned announcements, given
   succinctly and calmly, repeating the message several times, can do much to minimize
   panic or disorderly egress. The same information can be posted at strategic locations.
•  Are there planned "sweeps" to check for lingerers, persons with disabilities, and anyone
   who suffers injury during egress?
•  Is there "contingency planning" for those occasions in which an egress route is blocked?
   Alternative routes need to be thought through well in advance of any need for such.

Return Process

•  Does planning allow for emergency evacuation that is considered precautionary and
   potentially temporary? How and when is the "all-clear" to be given?
•  How is this communicated first to the same staff who handled egress preparation?

Evaluation Process

•  Is there a written detailed document for common reference and training, and common
   understanding of its contents?
•  Are there periodic communication drills and subsequent refinement based on the
   experience?
•  Any plan can be improved if reviewed and tested, in part or in full, both by experts in the
   community and by the staff on which the plan relies